McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.
Quality Results with the most Impact on Performance
What activity or effort has the potential to provide the MOST impact on the PERFORMANCE of an installed HVAC system? What if I told you the LEAST expensive effort would … Read More
Measuring Success in a LEAN Environment
One of the key elements of a successful LEAN initiative is properly measuring the process. In simple terms, if you treasure it, measure it. This can apply to anything your … Read More
BOMA Georgia’s 2016 Trade Show
The Building Owners and Managers Association (BOMA) of Georgia held its annual trade show on May 25 at the Cobb Galleria Centre in Atlanta, GA. Building owners, managers and vendors from … Read More
Efficiency in Repurposed Office Tower
McKenney’s upgraded the HVAC system for 50-year old office building being rededicated into a mixed-use office and hotel space.
An Educated Approach to HVAC
McKenney’s installed HVAC ductwork and piping at a nanotechnology research and training facility under renovation at the Georgia Institute of Technology.
Partnership Through Collaboration – Why Design/Assist Works
In today’s market, Owners are faced with a myriad of choices in delivery methods for their projects. Project and Program Managers are charged with advising Owners and managing the design … Read More
The (Dis)connection between Construction and Operations
When considering options for HVAC systems for a large commercial or industrial facility, which option is better … saving 20% on design & construction costs or saving 10% annually on … Read More