An Efficient, Non-invasive Relocation

McKenney’s leveraged the collective strengths of three internal groups to fully design and install a system quickly and cost-effectively.

THE CHALLENGE 

The McKenney’s team needed to install the HVAC system in the new location without disrupting ongoing patient services occurring next door. They had to work around a significant amount of existing below-floor plumbing in occupied spaces. In addition, a large stainless-steel exhaust duct system had to be routed through multiple floors to the roof where the fan would be installed. 

THE SOLUTION 

Internal collaboration between the McKenney’s Engineering, Automation & Control Solutions and Healthcare teams eliminated the need for multiple contact points and created a seamless deliverable. By coordinating with the architect and general contractor, optimal routing and installation methods minimized disruption of the patient care areas. McKenney’s previous knowledge of the facility, design/build capabilities and on-staff medical gas certified technicians ensured a smooth, successful relocation. 

THE RESULTS 

The HVAC system was installed without disrupting medical services, on time and under budget. 

Project Name

Emory University Hospital Cardiology Department Relocation

Location

Atlanta, Georgia 30342

Team

Owner: Emory Healthcare
General Contractor: Segars Group, LLC
Architect: Demoss and Associates
Engineer: McKenney’s, Inc.
Contractor: McKenney’s, Inc.