McKenney’s installed HVAC ductwork and piping at a nanotechnology research and training facility under renovation at the Georgia Institute of Technology.

THE CHALLENGE

While the two floors of laboratory shell space were being renovated, other areas of the facility that were occupied had to remain operational. With nearly 75 percent of the construction in overhead spaces, numerous ceiling conflicts had to be resolved.

THE SOLUTION

With a rooftop HVAC system already in place, the McKenney’s team began by using Building Information Modeling (BIM) to assess as-built conditions of the renovated space. Then, by preplanning, the team proposed solutions to overcome the ceiling conflicts while meeting the building owner’s expectations for quality, speed, and safety. All ductwork and piping were prefabricated, and by removing a window in the building, a crane placed the components where they were needed.

THE RESULTS

McKenney’s successfully installed the largest components for the renovation early in the project schedule—impressing the university—which will likely lead to ongoing renovation work at the facility.

Project Name

Georgia Tech Institute for Electronics and Nanotechnology Research Center

Location

Marcus Nanotechnology Bldg, 345 Ferst Dr NW, Atlanta, GA 30318

Team

Owner: Georgia Institute of Technology
General Contractor: Gilbane Inc.
Architect: Architecture49
Engineer: Architecture49
Contractor: McKenney’s, Inc.