Promenade Tower, an iconic office tower on the Atlanta skyline, needed replacements and upgrades to its HVAC and plumbing systems. These renovations included new fan coil units (FCUs), ductwork, and … Read More
Aprio – 1st, 17th, and 18th Floors
McKenney’s partnered with Humphries and Company on a 50,000-square-foot second-generation office renovation for Aprio, LLP, a Financial Consulting and CPA firm in Atlanta, Georgia. The renovations included two floors of … Read More
Making Room at VERO Biotech
McKenney’s expanded VERO Biotech’s production facility to significantly increase their manufacturing capacity and allow them to meet increased demand for nitric oxide in the healthcare industry. THE CHALLENGE VERO Biotech … Read More
Black Rock – 10th Floor
The BlackRock 10th floor project is an interior build-out of commercial office space located at 725 Ponce de Leon Ave. NE, in Atlanta, Georgia. This 35,000 square foot build-out includes … Read More
Global Payments
Global Payments, a worldwide leading provider of payment technology and software solutions hired CA South LLC and McKenney’s to collaborate on this fast-paced, 150,000 square feet commercial office tenant upfit … Read More
Repurposing Groundwater, Creating Value
As a design/build mechanical contractor serving the southeast, McKenney’s was selected to partner with Greenstone Properties, Balfour Beatty Construction and various other subcontractors to build 14th and Spring, a Class … Read More
1200 Peachtree Build-out
1200 Peachtree is a Class A Office Building that features 370,000 square feet of office space and is located at 1200 Peachtree Street NE in the Midtown Atlanta neighborhood. McKenney’s … Read More
3350 Peachtree
3350 Peachtree is located in the heart of Buckhead and directly adjacent to the Buckhead MARTA station. The 9-floor, 180,000-square-foot Class A office interior build-out project included mechanical and control … Read More
Streaming with Newfound Efficiency
Diverting more than 70,000 gallons of groundwater is a complicated and expensive task, especially when it occurs daily and requires an extensive transport and filtration process. The groundwater was from … Read More