Loading
McKenney’s renovated the HVAC and plumbing systems at the corporate campus of a major company in Atl…
McKenney’s leveraged its Building Services Division (BSD) relationship to perform a central plant re…
To accommodate expansion of the clinical and future patient spaces, McKenney’s relocated existing eq…
McKenney’s provided design/assist services and installed a condenser water cooling system and contro…
McKenney’s monitored, analyzed and repaired existing mechanical systems in the Allen Plaza high-rise…
McKenney’s helped redesign, then install mechanical systems at the new Charles R. Drew Charter Schoo…
McKenney’s installed air-cooled chillers, a mechanical plant, all ductwork, piping and plumbing for …
Georgia Tech built a 45,000-squarefoot facility to research energy efficient technologies with a goa…
McKenney’s helped T3 Labs reduce energy consumption and operating costs at its facility in Atlanta, …
Georgia Tech constructed a state-of-the-art basketball arena to enhance its existing coliseum, built…
McKenney’s installed additional cooling systems and capacity at Internap’s premium colocation facili…
McKenney’s installed a complex HVAC system at the St. Regis Hotel & Residences during constructi…
McKenney’s utilized double wall foam filled ductwork at QT Kitchens to eliminate sweating in a criti…
McKenney’s coordinated the building of a massive new Omni Hotel and expansion of the Country Music H…
McKenney’s installed a 900-ton air-cooled chilled water plant and associated distribution system for…
McKenney’s helped AdvancED— the world’s largest school accrediting agency—earn LEED® Gold certificat…