McKenney’s and Turner Construction Company installed HVAC and plumbing systems for a four-story STEM research building on the University of Georgia’s main campus. The project’s scope included approximately 100,000 square … Read More
Meeting Complex Healthcare Needs
McKenney’s worked with Turner Construction Company as the design-assist partner to renovate approximately 16,000 square feet of space on two floors of Grady Memorial Hospital into new behavioral health areas … Read More
Emory University Achieving Environmental Excellence
Emory University’s Rollins School of Public Health holds an international reputation as one of the world’s leading schools in public health scholarship and research. The University’s newest addition, the R. … Read More
McKenney’s Provides Sustainable Solutions with Repurposed Groundwater
When the 14th & Spring building in Midtown Atlanta planned to have five below-ground parking deck levels built, they immediately encountered an obstacle—this parking deck would extend into the site’s … Read More
Center Build Presents New Challenges
The Challenge Aggressive schedule for base build, interiors upfit and controls installation Compliance to the owner’s budget The Solution Installed mechanical systems to improve air quality while maintaining physical distancing … Read More
Keeping Cool with Full Coverage
PROJECT NAME Large Corporate Campus Build-to-Suit PROJECT LOCATION Atlanta, Georgia
Healing Through Energy Efficiency
The Challenge: Incomplete original construction documents Multiple workspace reconfigurations Reduce utilities consumption spend by $250,000 annually
Solve the Performance Challenges of Your Healthcare Facility
Keeping a facility operating around the clock is no small job. Add in aging systems with device and sensor issues, and you have a facility that has too much variance … Read More
Towering Above with Greater Control
McKenney’s designed, installed and integrated automated control system solutions for two new office towers on a state-of-the-art campus in Midtown Atlanta.