Experiences

Cooperating on a Campus Modernization

McKenney’s renovated the HVAC and plumbing systems at the corporate campus of a major company in Atlanta, Georgia.

THE CHALLENGE

This was the first time McKenney’s was asked to perform a complete renovation of this company’s HVAC and plumbing systems. The team had to gut the existing building while leaving much of the infrastructure in place. To ensure success, a BIM model had to be built based on structural and architectural files that didn’t factor in existing infrastructure.

THE SOLUTION

The McKenney’s team revised the BIM model to capture the current building structure and reroute around existing systems such as chilled water mains, storm drain piping and large conduit. All the sheet metal was prefabricated in the longest lengths that could fit into the building while the small split system piping was rerouted onsite in the field. Using the revised BIM model and Trimble® field layout software, the team was able to order all materials without issue, expedite duct fabrication and maintain the project schedule

THE RESULTS

Completed on time and under budget, this modern corporate office will serve the company for years to come.

Project Name

Commercial Office Renovation

Location

Atlanta, Georgia

Team

Owner: Major Multinational Beverage Corporation
General Contractor: Builders 2020, A Joint Venture
Contractor: McKenney’s, Inc.

Specializations
Markets