McKenney’s renovated the life support piping systems at the Gulfarium Marine Adventure Park in Florida.

THE CHALLENGE

Working within the customer’s budget, McKenney’s had to renovate the life support piping systems at a popular aquatic park during a seasonal shutdown. There were no designs or drawings to guide the work, and the team had to replace a badly damaged overflow line as well as unclog and stop leaks in remaining steel pipes.

THE SOLUTION

McKenney’s conducted the work in two phases to accommodate the customer’s budget. With the knowledge gained from a previous large aquarium piping project, the Georgia Aquarium and McKenney’s team coordinated the design with facility personnel and created drawings for fabrication and installation. To unclog pipes that would remain in place and prevent future leaks, McKenney’s cleaned and lined the pipes with fiberglass.

THE RESULTS

McKenney’s resolved the life support piping system issues and performed the work on time and under budget while returning savings to the owner of Gulfarium Marine Adventure Park.

Project Name

Gulfarium

Location

1010 Miracle Strip Parkway SE Fort Walton Beach, Florida 32548

Team

Owner: Gulf Exhibition Corporation
General Contractor: McKenney’s, Inc.
Engineer: Georgia Aquarium, Inc. and McKenney’s, Inc.
Contractor: McKenney’s, Inc.