Delivering for Pharma Giant

McKenney’s completed a large-scale HVAC and plumbing installation at a new manufacturing plant on a 100-acre campus in Covington, Georgia.

THE CHALLENGE

From the outset, the owner had an aggressive timeline for completing its new campus to manufacture drugs for treating unusual diseases. Our team faced an immense project scope, a large number of trade workers in a confined space, design changes, rigorous quality control requirements and the emergence of an outside main instrument valve vendor.

THE SOLUTION

To navigate design changes and meticulously track costs, McKenney’s held weekly—sometimes daily—meetings to identify the scope of changes, evaluate pricing and inform the owner of overages. Our quality control team addressed onsite issues and procured a third-party firm to ensure welding in our prefab pipe shop and field installations met the owner’s standards. For much of the project, all trades deployed two shifts along with extended work hours to stay on schedule.

THE RESULTS

Our attentiveness to detail kept the project on track and met the owner’s timeline and quality control standards.

Project Name

Pharmaceutical Manufacturing Facility

Location

Covington, Georgia

Team

Owner: Biopharmaceuticals Manufacturer
General Contractor: Fluor Corporation
Architect: Flad Architects
Engineer: AEI Corporation, CRB Consulting Engineers
Contractor: McKenney’s, Inc.