Delivering for Pharma Giant

Delivering-for-Pharma-Giant McKenney’s completed a large-scale HVAC and plumbing installation at a new manufacturing plant on a 100-acre campus in Covington, Georgia.

 

The Challenge

From the outset, the owner had an aggressive timeline for completing its new campus to manufacture drugs for treating unusual diseases. Our team faced an immense project scope, a large number of trade workers in a confined space, design changes, rigorous quality control requirements and the emergence of an outside main instrument valve vendor.

 

The Solution

To navigate design changes and meticulously track costs, McKenney’s held weekly—sometimes daily—meetings to identify the scope of changes, evaluate pricing and inform the owner of overages. Our quality control team addressed onsite issues and procured a third party firm to ensure welding in our prefab pipe shop and field installations met the owner’s standards. For much of the project, all trades deployed two shifts along with extended work hours to stay on schedule.

 

The Results

Our attentiveness to detail kept the project on track and met the owner’s timeline and quality control standards.

About Kumba McCritty

Website: https://www.mckenneys.com/

Email Address: kumba.mccritty@mckenneys.com

Kumba McCritty began at McKenney's in 2011 as a Marketing Specialist. Upon graduating from Fordham University, she has worked in sales, account management and marketing. Kumba enjoys being challenged professionally while also having the opportunity to grow in her position at McKenney’s. This growth has allowed her to become a Proposal Specialist, where she continues to be vital piece of the McKenney’s marketing team.

Leave a Reply

Your email address will not be published. Required fields are marked *