Pre-fab Headers Keep Job Ahead of Schedule

Project Name

Downtown Data Center Chilled Water Plant

Project Location

Atlanta, Georgia

Project Team

Owner: Premier data center (REIT) Real Estate Investment Trust

General Contractor: DPR Construction

Contractor: McKenney’s, Inc.

Specializations

Building Information Modeling

Design/Assist

LEED Certification

Pipe Shop Prefab

Sheet Metal Shop Prefab

Markets

Mission Critical

 

McKenney’s constructed and installed a rooftop chilled water (CHW) plant, piping and ducting at a new 35,000-square-foot colocation data center in downtown Atlanta.

 

The Challenge

McKenney’s had to install completely redundant piping with eight-inch mains and 12-foot-tall steel supports for the plant consisting of a pre- manufactured pump house and three 350-ton air cooled chillers. The major electrical and mechanical equipment—as well as piping and supports—had to be lifted to the roof during one weekend with a shared crane. Working on an elevated platform, the team had only 10 days for installation after pipe placement on the roof and no option for “stick-building” the piping system.

 

The Solution

To minimize safety risks, the McKenney’s team spent nearly 1,500 hours manufacturing completely assembled headers including engineered steel supports in advance at its fabrication facility. McKenney’s 16-member crew then safely lifted all of the equipment and piping to the roof.

 

The Results

he team completed the installation in less than a week—with no major safety concerns—allowing the CHW system to start up on schedule.

 

Have a question for our experts or want to see more project highlights? Leave your comment below and check out our website and knowledgebase for more information.

About Kumba McCritty

Website: https://www.mckenneys.com/

Email Address: kumba.mccritty@mckenneys.com

Kumba McCritty began at McKenney's in 2011 as a Marketing Specialist. Upon graduating from Fordham University, she has worked in sales, account management and marketing. Kumba enjoys being challenged professionally while also having the opportunity to grow in her position at McKenney’s. This growth has allowed her to become a Proposal Specialist, where she continues to be vital piece of the McKenney’s marketing team.

Leave a Reply

Your email address will not be published. Required fields are marked *