A Greener Hospital by Design

captureMcKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton.

 

The Challenge

Integrating multiple systems seamlessly into a new facility can be complex and challenging. To accomplish this, McKenney’s assisted the design team by providing cost-effective mechanical system options while also helping the center pursue LEED® for Healthcare Gold certification and meet LEAN construction requirements.

 

The Solution

To support LEED certification, McKenney’s used a geothermal field with a modular heat pump chiller instead of traditional chillers and boilers. It uses the constant temperature of the earth to regulate building temperatures more efficiently. the geothermal field will also support a radiant floor system in the hospital’s large, open spaces. To promote LEAN construction, McKenney’s in-house sheet metal and piping prefabrication shops were used extensively along with prefabricated bathroom pods.

 

The Results 

Despite one of the wettest, coldest winters on record, work is being completed on time and within budget for the Spring 2015 opening.

 

Have a question for our experts or want to see more project highlights? Leave your comment below and check out our website for more information.

About Mike Tzimenatos

Website: https://www.mckenneys.com

Email Address: mike.tzimenatos@mckenneys.com

Leave a Reply

Your email address will not be published. Required fields are marked *